News


Cooperation with LLC LUKOIL-Komi
01/08/2017

Cooperation with LLC LUKOIL-Komi

At the end of July, Uraltechnostroy Corporation LLC completed the manufacture of the Pump station for external pumping of oil and produced water intended for the Usinskoye field of LLC LUKOIL-Komi. 

The Usinskoe field found in 1963 is the largest in the Komi Republic. The development of the field is carried out by taking into account the maintenance of seismic balance by injecting water into the reservoir or by injecting steam. At present, the field's production is more than a third of total republican hydrocarbons. According to the forecasts of economic observers, the reserves of the field will be sufficient until 2030.

LLC "LUKOIL-Komi" implements a number of works on reconstruction of facilities providing continuous development of this field. Within the framework of this program, Corporation Uraltechnostroy LLC supplies the Pump station for external pumping of oil and produced water for the capital construction project "Reconstruction of BPS (booster pump station)-2 with PWDU" of the Usinskoye field.

The last units of equipment brought into the transport position and shipped by railway transport to Usinsk.


Back to the list