News


MCPS for Prirazlomnoye field
06/02/2017

MCPS for Prirazlomnoye field

At the end of January from the production site of LLC Corporation Uraltechnostroy shipment of the next project for LLC RN-Yuganskneftegaz was completed. The modular cluster pump station will be operated on CPS-2 on the SW of the Prirazlomnoye field.

The field is located in the Nefteyugansk district, in 100 km south-west of the Surgut city, and is confined to the western slope of the Salym dome elevation of the Sredneobskoye oil and gas area of the West Siberian oil and gas province.

Lately specialists of Corporation have realized two more projects for LLC RN-Yuganskneftegaz: Pump station of external and internal pumping of oil and Modular cluster pump station.


Back to the list